Skip to content

CSB XHRL12475W Battery

Alpine Power Systems' experienced technical support & sales team is here to assist your needs:

THE CSB XHRL12475W battery is specially designed for high-rate discharge applications. The XHRL12475W battery’s service life is up to 10 years in standby use.

CSB XHRL12475W Battery

On this page:

THE CSB XHRL12475W battery is specially designed for high-rate discharge applications. The XHRL12475W battery’s service life is up to 10 years in standby use. THE CSB XHRL12475W battery is designed for Standby Power Applications.

Cells Per Unit: 6

Voltage Per Unit: 12 V

Capacity: 475.0W @ 15minute-rate to 1.67V per cell @ 25°C (77°F)

Weight: Approx. 79.78 lbs

Maximum Discharge Current: 800A (5sec)

Internal Resistance: Approx. 2.30 mΩ

Operating Temperature Range:

  • Discharge:-15℃~50℃ (5°F~122°F)

  • Charge:-15℃~40℃ (5°F~104°F)

  • Storage:-15℃~40℃ (5°F~104°F)

Nominal Operating Temperature Range: 25°C±3°C (77°F±5°F)

Float Charging Voltage: 13.5 to 13.8 VDC  / Unit Average at 25°C(77°F)

Recommended Maximum Charging Current Limit: 47.5A

Equalization Charging Voltage: 14.4 to 15.0 VDC/Unit Average at 25°C(77°F)

Self-Discharge: Less than 10% after 90 days, can be stored up to 6 months at 25℃ (77℉)

Terminal I:2 (1/4”) thread lead alloy terminal to accept M6 (1/4”) bolt

Container Material: Flame Retardant Polypropylene (UL 94-V0)

See below for documentation relating to this product line that is available to download. To download this documentation, please click on the desired document you’d like to download and fill out the required form information fields. You will be able to view and download the documents upon completion of the download form.

PDF Document
csb-xhrl12475w.pdf
PDF Document
csb-xhrl12620w.pdf

This product is part of the CSB XHRL Batteries family.

Find CSB XHRL12475W Battery in the following product categories:

ISO Certifications

Alpine Power Systems is proud to have three ISO Certifications that have been awarded to us after comprehensive audits completed by third-party, independent experts. Alpine must validate that all ISO processes are being followed through yearly follow up inspections.

Certification Certification Certification

Contact Us

Alpine Power Systems' experienced technical support & sales team are here to assist your needs.